Charge
Store available grid or solar energy under a defined charging schedule.
Grid interruptions can force expensive DG operation, disrupt production and expose the plant to steadily rising fuel and energy costs.
The BESS remains connected to the plant electrical system. Its operating logic responds to grid availability, facility load, critical-load priority, tariff conditions and available battery capacity.
Store available grid or solar energy under a defined charging schedule.
The EMS tracks grid status, plant demand, battery limits and the selected operating objective.
Supply selected plant loads during an outage, a demand peak or another approved operating condition.
The final operating strategy is selected from your actual load profile, outage pattern, tariff structure, solar generation and electrical-system limits.
The BESS can limit grid demand above a selected threshold and, during a grid outage, continue supplying a defined critical-load block.
Replace eligible diesel-generated energy with stored grid or renewable electricity during outages.
Store surplus solar generation and use it later when production demand is higher.
Support power factor and voltage where the selected PCS configuration and available capacity permit.
We integrate the complete plant-side system, including BESS, PCS, EMS, LT/MV switchgear, transformer interface, protection and controls.
Load, outage, DG, tariff and infrastructure assessment.
Power, energy, controls, protection and commercial sizing.
BESS, PCS, EMS, LV/MV switchgear and auxiliaries.
Installation, testing, interlocking and performance validation.
Performance visibility, preventive service and support.
The first form asks only for information normally available with the owner, plant head or accounts team. Detailed electrical data can follow during the site audit.
Share preliminary operating information. Electricare will review the potential use cases and advise whether a detailed site audit is justified.
Request preliminary assessment